Identifying path forward for Project 1
|
| RG: Walked through existing code for AHFEs RG: identified start and end point in code for experimental interchange branch, as expressed in diagram in above doc both: Discussed end game for determining success in the code branch. Could either proceed with: preparing Systems and analytically checking the prepared forces etc, differences between prepared Systems should be down to “noise” of different solvation methods running AHFE on alchemiscale with both branches and checking DG within error (should be aligned as FF is identical)
|